How long will
your MVP take?
Pick a platform and the features your first version truly needs. Get a rough week range, and see exactly where the weeks go.
Rough planning estimate for a first version
4 to 8 weeks
| Part | Weeks |
|---|---|
| Web app baseDesign, the core flow, hosting and launch for one web app. | 3 to 5 |
| User accountsSign-up, login, password reset, profiles | 0.5 to 1 |
| Testing and launchFixes, polish and getting it live. | 1 to 1.5 |
Totals round down at the low end and up at the high end. A planning aid, not a quote: the real number depends on details only a conversation can surface.
How this works
The estimate adds up fixed weights for a small, focused team building a first version people can use and pay for. Every weight is in the breakdown next to your total.
- A platform base covers design, the core flow, hosting and launch:web app 3 to 5 weeks; ios and android 5 to 8 weeks; web and mobile 7 to 11 weeks; desktop (mac and windows) 5 to 8 weeks.
- Each feature adds its own range. On more than one surface it takes longer, so feature weights are multiplied:x1 for web app, x1.15 for ios and android, x1.5 for web and mobile, x1.1 for desktop (mac and windows).
- Custom brand design adds 1 to 2 weeks. A clean, standard design adds nothing.
- Testing and launch is always 1 to 1.5 weeks.
These are our own rules of thumb, not an industry statistic. Use the range to plan and to decide what to cut, then get a real plan for your scope.